
M2L is starting work on the as part of the Flatiron Dragados Joint Venture team as a subconsultant to FIGG Bridge Engineers. M2L will provide landscape architectural and urban design services for the iconic bridge structure that is slated to be one of the largest in the world.
Upon completion, the Harbor Bridge will be the longest concrete segmental, cable-stayed bridge in North America. Crossing the Corpus Christi Ship Channel and rising 205 ft above water with a main tower height of 538 ft, the finished bridge will also be the tallest structure in south Texas, according to the project team.
Flatiron Dragados is a multinational firm delivering resilient, innovative and sustainable infrastructure projects. FIGG Bridge Engineers specializes in the management of diverse engineering teams for major bridge transportation projects and in the design of major concrete segmental bridges.
Fun facts about the US 181 Harbor Bridge